View of the plans drawn up for building bridges in different places in the town of Amezqueta [as part of the construction of the main road]
Document:
157
Author:
Arzadun, Josef Antonio de
File:
Planos y presupuestos de las obras del camino real que va de Bergara a Getaria, atravesando Azpeitia, Azkoitia, Zestoa y Aizarnazabal
Date Ilustration format :
1842
Date Theme :
1842
Physical description:
1 19 x 20 cm plan on a 68 x 47 cm page; col.
Notes:
Scale: small feet to govern the previous figures adapted to Castilian feet. Caption Fig. 13: plan of the stone bridge over the river that flows down from the copper factories on Aralar in the municipal area of Yrigoyen opposite the road for these factories and mountains on Aralar. Fig. 14: elevation and exterior view. Fig. 15: cross section along section YK Autographed.