110 results have been found for your search. You can get more information by click-ing the image. To look at the data in the image's language select Original language:
Opening of the railway line from Miranda to Vitoria, after it had been cut for 25 months: Vitoria: arrival of the first train in the station, on the 23rd of this month
Original language >>
Vitoria – Boring an artesian well in the Old square, supervised by the engineer M.A. Richard
Original language >>
Vitoria - Boring an artesian well in the Old square, supervised by the engineer M.A. Richard
Original language >>
Military manoeuvres in the fields of Alava, directed by H. M. the King: review in the meadow or "Larra de Antezana", on the 14th of this month
Original language >>
Trouve system device, used by telegraph engineers in the army of the North
Original language >>
Vitoria – Artesian well bored under the engineer M. Richard’s supervision, visited by H. M. the King on the 20th of this month
Original language >>
Telegraph engineer receiving and transmitting dispatches during the march, in the army of the North
Original language >>
Vitoria – Troops parading after the review in the Antezana fields attended by H.M. the King
Original language >>
Sketches of the military manoeuvres conducted in Alava : 1. Appearance of the field in Antezana on the morning of the 14th of October, before the arrival of H. M. the King
Original language >>
Sketches of the military manoeuvres conducted in Alava: 2. Chuliando fort, that fired 320 cannonshots on the second day of the manoeuvres
Original language >>
Sketches of the military manoeuvres conducted in Alava: 3. H. M. the King and his General Staff have lunch in the church square in Miñano-mayor, on the 17th, first day of the manoeuvres
Original language >>
Sketches of the military manoeuvres conducted in Alava: 4. Attack on Chuliando by the Reserve Regiments, Luchana and America, the Arlaban Riflemen, the Cavalry of Numancia and Spain and the 6th Mounted artillery
Original language >>